The Miami Springs Community Center Project

THIS IS A CONSTRUCTION ESTIMATING PROJECT REPORT

I need help writing an Executive summary, a one (or two) page(s) summary of the information you are providing to the owner. This should include but is not be limited to (1) a brief introduction of the work, (2) the total bid price, and (3) the bid form.

-The Name of the Project is:

The Miami Springs Community Center
Located at 1401 Westward Drive – Miami Springs, FL 33166

-The Brief Introduction must have all the steps to understand the project, the skills you need to know to get a good construction estimating assessment, and mention very briefly the procedures, assumptions, and references that I will add after this two-page Executive Summary & Introduction.

-Bid Construction Form needs to talk about briefly the scope of work and Construction Disciplines, which are the following:
1. Conveying Systems
2. Fire Suppression
3. Heating, Ventilating & Air-Conditioning.
4. Electrical.
5. Plumbing.
6. Utilities.
7. Concrete.
8. Metals
9. Finishes.
10. Openings.

The Total price for just the Scope of Work or Construction Disciplines is =
$ 3,328,989.56

– The Introduction and Executive Summary can also talk about the computer skills that the estimator has to have. Experience. The ability to interpret well-done construction drawings and schedules. Get Familiar with the project. The procedures, assumptions, etc.
– You can add your consideration to whatever you think a construction estimator needs to know to get an accurate Construction Estimating assessment.

IF YOU NEED ANY INFORMATION FROM ME THAT YOU NEED TO KNOW OR IF YOU HAVE ANY QUESTIONS PLEASE LET ME KNOW.

I WILL REPLY PROMPTLY.

Last Completed Projects

topic title academic level Writer delivered