Project Report: Miami Springs Community Center

This project is about Construction Estimating.

I need to write a brief Executive summary of two pages of information I need to provide to the owner:

1. This must include a brief introduction of the work, which I will provide below the details.
2. The Total cost (I will provide this too).
3. Bid Form, which I will specify as well (The estimate and quantity Take-off of Scope of Work, Construction Disciplines, etc.)

DETAILS:

– Name of the Project:
The Miami Springs Community Center

-The Total Cost = $3,328,989.56. just for the disciplines below specified.

-The Scope of Work & Construction Disciplines are the following:
1. Conveying Systems (Elevator)
2. Fire Suppression
3. Heating, Ventilating & Air-Conditioning.
4. Electrical.
5. Plumbing.
6. Utilities.
7. Concrete.
8. Metals
9. Finishes.
10. Openings.

– Introduction Details can mention very briefly the assumptions, procedures, and references that I WILL add after this two-page Executive Summary.
– The Introduction and Executive Summary can talk about the skills required to make an accurate Construction Estimate. The procedures to make calculations, software skills, interpreting correctly construction drawings and schedules, experience, familiarity with the drawings of the project, etc.
-You can add your consideration to whatever you think a construction estimator needs to know for a precise construction estimating assessment.

LET ME KNOW IF YOU NEED INFORMATION FROM ME OR IF YOU HAVE ANY QUESTIONS.
I WILL REPLY PROMPTLY.

Last Completed Projects

topic title academic level Writer delivered